Status & progress
Per MahaRERA record as of Jul 2026.
Project basics
As filed with MahaRERA — not analysis, just the record.
- Promoter
- Marvel Constructions · Partnership
- Project type
- Residential / Group Housing
- Land area
- 2,450 m² · Permissible built-up (FSI) 9,878 m²
- Total units
- 106 across 1 wing
- Estimated cost
- ₹70 Cr
- Held outside open sale
- 28 rehab
- Application date
- 18 Dec 2024
1 wing
Floors and unit counts as filed.
| Wing | Floors sanctioned | Total units |
|---|---|---|
| NA | 20 of 20 proposed | 106 |
Promoter & professionals
Names and registrations as declared — no background analysis.
- Architect
- Apex Constutancy · MBMC/W2024/APL/00035
- Structural engineer
- Proctech consultants · STNDf114(STR uw14721)
- Project bank
- IDBI BANK
Where it sits
Bhayandar west, Thane — 401101.
No active red flags
Absence of a flag reflects the record as filed, not an assessment of safety.
Icon 101: common questions
Is Icon 101 RERA registered?
Yes. Icon 101 is registered with MahaRERA under registration number P51700078788, granted on 13 January 2025. As of July 2026, the registration is active.
What is the possession date of Icon 101?
The developer has declared completion by December 2029 in its MahaRERA filing. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.
Who is the builder of Icon 101?
Icon 101 is developed by Marvel Constructions, the promoter named in its MahaRERA registration.
Where is Icon 101 located?
Icon 101 is in Bhayandar West, Thane (PIN 401101), Maharashtra, as declared in its RERA registration.
How many units does Icon 101 have, and how many are sold?
Icon 101 has 106 units on its RERA registration. 12 were reported sold as of July 2026, leaving 94 unsold.
How much construction of Icon 101 is complete?
By the developer's own quarterly filing, 33% of the work is done, measured against the project's cost estimate.
Is there any litigation against Icon 101?
No litigation is declared on Icon 101's MahaRERA record as of July 2026. A clean record reflects what was filed, not a legal title check.
More RERA projects in Bhayandar West
- Tirupati Ritu Empire · Thane
- Skyline Wing - B · Thane
- Skyline Wing - C · Thane
- Bhairav Enclave · Thane
- Imperial Residency · Thane
- Salasar Sparsh Phase I · Thane
- Sumit Star Exclusif · Thane
- Tirupati Complex · Thane