Status & progress

Per MahaRERA record as of Jul 2026.

Construction
27%
cost-weighted
Declared completion
Oct 2028
no delay on record
Units sold
455 / 1025
44% sell-through
Basics

Project basics

As filed with MahaRERA — not analysis, just the record.

Promoter
Adrika Developers Private Limited · Company
Project type
Residential / Group Housing
Land area
10,771 m² · Permissible built-up (FSI) 66,570 m²
Total units
1025 across 1 wing
Estimated cost
₹204.8 Cr
Application date
18 Aug 2023
Buildings & units

1 wing

Floors and unit counts as filed.

WingFloors sanctionedTotal units
NA33 of 33 proposed1025
People on record

Promoter & professionals

Names and registrations as declared — no background analysis.

Architect
Spaceage Consultants
Structural engineer
Paras R Vishwakarma
Project bank
HDFC BANK
Location

Where it sits

Kalher Junction, Bhiwandi, Thane — 421302.

Locality
Kalher Junction, Bhiwandi
District
Thane
Authority
MMRDA
Red flags

1 flag on this project

What they are and why they matter — in the full report.

Unlock the 1 red flag on this project, plus the delay analysis and what-to-verify checklist.

Unlock full report — ₹99
Delay analysis & explanations

Why these flags matter

Unlock the delay analysis, sales & construction narrative, and what-to-verify checklist for this project.

Unlock full report — ₹99
Legal & encumbrance

Complaints, litigation & charges

Unlock the complaint list with order and warrant detail, plus full encumbrance and litigation detail and the FAQ.

Unlock full report — ₹99

Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1: common questions

Is Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 RERA registered?

Yes. Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 is registered with MahaRERA under registration number P51700053057, granted on 12 October 2023. As of July 2026, the registration is active.

What is the possession date of Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1?

The developer has declared completion by October 2028 in its MahaRERA filing. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.

Who is the builder of Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1?

Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 is developed by Adrika Developers Private Limited, the promoter named in its MahaRERA registration.

Where is Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 located?

Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 is in Bhiwandi, Thane (PIN 421302), Maharashtra, as declared in its RERA registration.

How many units does Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 have, and how many are sold?

Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 has 1025 units on its RERA registration. 501 were reported sold as of July 2026, leaving 524 unsold.

How much construction of Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1 is complete?

By the developer's own quarterly filing, 27% of the work is done, measured against the project's cost estimate.

Is there any litigation against Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1?

2 litigation cases are declared on Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 1's MahaRERA record. The full report lists each case with its court and status.