In ExtensionP51800001137Registered Jul 2017Delayed 365dExtension2 red flags

Runwal Forests Tower 9 - 11

A residential / group housing project by Wheelabrator Alloy Castings Limited in Bhandup(W), Mumbai Suburban.

Data as of Sept 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗

Overview

Status & progress

Per MahaRERA record as of Sept 2026.

Construction
82%
cost-weighted
Declared completion
Jun 2027
delayed 365d
Units sold
984 / 1047
94% sell-through
Basics

Project basics

As filed with MahaRERA — not analysis, just the record.

Promoter
Wheelabrator Alloy Castings Limited · Company
Project type
Residential / Group Housing
Land area
62,558 m² · Permissible built-up (FSI) 71,521 m²
Total units
1047 across 3 wings
Estimated cost
₹433.3 Cr
Parking
1047 four-wheeler · 0 two-wheeler
Application date
19 Jul 2017
Buildings & units

3 wings

Floors and unit counts as filed.

WingFloors sanctionedTotal units
NA53 of 53 proposed191
NA59 of 59 proposed428
NA59 of 59 proposed428
People on record

Promoter & professionals

Names and registrations as declared — no background analysis.

Architect
Aakar Architects & Consultants
Structural engineer
Epicons Consultant Pvt. Ltd. Structural Architect
Project bank
INDUSIND BANK
Location

Where it sits

Bhandup(W), Mumbai Suburban — 400078.

Locality
Bhandup(W)
District
Mumbai Suburban
Authority
Others
Red flags

2 flags on this project

What they are and why they matter — in the full report.

Unlock the 2 red flags on this project, plus the delay analysis and what-to-verify checklist.

Unlock full report — ₹99
Delay analysis & explanations

Why these flags matter

Unlock the delay analysis, sales & construction narrative, and what-to-verify checklist for this project.

Unlock full report — ₹99
Legal & encumbrance

Complaints, litigation & charges

Unlock the complaint list with order and warrant detail, plus full encumbrance and litigation detail and the FAQ.

Unlock full report — ₹99

Runwal Forests Tower 9 - 11: common questions

Is Runwal Forests Tower 9 - 11 RERA registered?

Yes. Runwal Forests Tower 9 - 11 is registered with MahaRERA under registration number P51800001137, granted on 26 July 2017. As of September 2026, the registration is active under a MahaRERA extension.

What is the possession date of Runwal Forests Tower 9 - 11?

The developer has declared completion by June 2027 in its MahaRERA filing, revised from the original June 2026. The record shows the project running 365 days behind its declared schedule. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.

Who is the builder of Runwal Forests Tower 9 - 11?

Runwal Forests Tower 9 - 11 is developed by Wheelabrator Alloy Castings Limited, the promoter named in its MahaRERA registration.

Where is Runwal Forests Tower 9 - 11 located?

Runwal Forests Tower 9 - 11 is in Bhandup West, Mumbai (PIN 400078), Maharashtra, as declared in its RERA registration.

How many units does Runwal Forests Tower 9 - 11 have, and how many are sold?

Runwal Forests Tower 9 - 11 has 1047 units on its RERA registration. 1016 were reported sold as of September 2026, leaving 31 unsold.

How much construction of Runwal Forests Tower 9 - 11 is complete?

By the developer's own quarterly filing, 82% of the work is done, measured against the project's cost estimate.

Is there any litigation against Runwal Forests Tower 9 - 11?

10 litigation cases are declared on Runwal Forests Tower 9 - 11's MahaRERA record. The full report lists each case with its court and status.

More RERA projects in Bhandup West

All RERA projects in Bhandup West →