Presidence Marina
A mixed project by Futuristic Realty in Mazgaon, Mumbai City.
Data as of Jul 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗
Status & progress
Per MahaRERA record as of Jul 2026.
Project basics
As filed with MahaRERA — not analysis, just the record.
- Promoter
- Futuristic Realty · Partnership
- Project type
- Mixed
- Land area
- 1,256 m² · Permissible built-up (FSI) 1,670 m²
- Total units
- 26 across 1 wing
- Estimated cost
- ₹70 Cr
- Parking
- 99 four-wheeler · 0 two-wheeler
- Held outside open sale
- 1 reserved
- Application date
- 02 Feb 2026
1 wing
Floors and unit counts as filed.
| Wing | Floors sanctioned | Total units |
|---|---|---|
| NA | 8 of 8 proposed | 26 |
Promoter & professionals
Names and registrations as declared — no background analysis.
- Architect
- Ocean Designs · S/687/LS
- Structural engineer
- ZZ Consultants · STR/K/211
- Project bank
- KOTAK MAHINDRA BANK LIMITED
Where it sits
Mazgaon, Mumbai City — 400010.
No active red flags
Absence of a flag reflects the record as filed, not an assessment of safety.
Presidence Marina: common questions
Is Presidence Marina RERA registered?
Yes. Presidence Marina is registered with MahaRERA under registration number PM1170002502709, granted on 11 March 2026. As of July 2026, the registration is active.
What is the possession date of Presidence Marina?
The developer has declared completion by December 2030 in its MahaRERA filing, revised from the original December 2028. The record shows the project running 730 days behind its declared schedule. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.
Who is the builder of Presidence Marina?
Presidence Marina is developed by Futuristic Realty, the promoter named in its MahaRERA registration.
Where is Presidence Marina located?
Presidence Marina is in Mazgaon, Mumbai (PIN 400010), Maharashtra, as declared in its RERA registration.
How many units does Presidence Marina have, and how many are sold?
Presidence Marina has 26 units on its RERA registration. 0 were reported sold as of July 2026, leaving 26 unsold.
How much construction of Presidence Marina is complete?
By the developer's own quarterly filing, 0% of the work is done, measured against the project's cost estimate.
Is there any litigation against Presidence Marina?
No litigation is declared on Presidence Marina's MahaRERA record as of July 2026. A clean record reflects what was filed, not a legal title check.
More RERA projects in Mazgaon
- Presidence Eternia · Mumbai City
- Continental Horizon · Mumbai City
- Muffadal Heights · Mumbai City
- M4 Cledor · Mumbai City
- 379 Vista · Mumbai City
- Darul Mustafa · Mumbai City
- 10 Harbour Estates · Mumbai City
- Dhunjibhoy Ice Factorypvt Ltd · Mumbai City