Mirador Utsav Phase 1
A residential / group housing project by Mirador Dewellers Pvt Ltd in Vehloli Phata, Thane.
Data as of Sept 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗
Status & progress
Per MahaRERA record as of Sept 2026.
Project basics
As filed with MahaRERA — not analysis, just the record.
- Promoter
- Mirador Dewellers Pvt Ltd · Company
- Project type
- Residential / Group Housing
- Land area
- 13,200 m² · Permissible built-up (FSI) 14,135 m²
- Total units
- 227 across 13 wings
- Estimated cost
- ₹125.5 Cr
- Land ownership
- Promoter is the landowner
- Application date
- 29 Jul 2017
13 wings across 13 buildings
Floors and unit counts as filed.
| Wing | Floors sanctioned | Total units |
|---|---|---|
| NA | 5 of 5 proposed | 18 |
| NA | 5 of 5 proposed | 18 |
| NA | 5 of 5 proposed | 14 |
| NA | 5 of 5 proposed | 0 |
| NA | 5 of 5 proposed | 0 |
| NA | 5 of 5 proposed | 18 |
| NA | 1 of 1 proposed | 0 |
| NA | 5 of 5 proposed | 0 |
| NA | 5 of 5 proposed | 30 |
| NA | 5 of 5 proposed | 22 |
| NA | 5 of 5 proposed | 18 |
| NA | 5 of 5 proposed | 19 |
| NA | 9 of 9 proposed | 70 |
Promoter & professionals
Names and registrations as declared — no background analysis.
- Architect
- AARIF PUNJABI · CA/94/16872
- Structural engineer
- Project bank
- IDFC First Bank Ltd
Where it sits
Vehloli Phata, Thane — 421601.
1 flag on this project
What they are and why they matter — in the full report.
Unlock the 1 red flag on this project, plus the delay analysis and what-to-verify checklist.
Unlock full report — ₹99Why these flags matter
Unlock the delay analysis, sales & construction narrative, and what-to-verify checklist for this project.
Unlock full report — ₹99Complaints, litigation & charges
Unlock the complaint list with order and warrant detail, plus full encumbrance and litigation detail and the FAQ.
Unlock full report — ₹99Mirador Utsav Phase 1: common questions
Is Mirador Utsav Phase 1 RERA registered?
Yes. Mirador Utsav Phase 1 is registered with MahaRERA under registration number P51700012454, granted on 1 September 2017. As of September 2026, the registration is active under a MahaRERA extension.
What is the possession date of Mirador Utsav Phase 1?
The developer has declared completion by December 2029 in its MahaRERA filing, revised from the original December 2021. The record shows the project running 2923 days behind its declared schedule. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.
Who is the builder of Mirador Utsav Phase 1?
Mirador Utsav Phase 1 is developed by Mirador Dewellers Pvt Ltd, the promoter named in its MahaRERA registration.
Where is Mirador Utsav Phase 1 located?
Mirador Utsav Phase 1 is in Vehloli Phata, Thane (PIN 421601), Maharashtra, as declared in its RERA registration.
How many units does Mirador Utsav Phase 1 have, and how many are sold?
Mirador Utsav Phase 1 has 227 units on its RERA registration. 144 were reported sold as of September 2026, leaving 83 unsold.
How much construction of Mirador Utsav Phase 1 is complete?
By the developer's own quarterly filing, 103% of the work is done, measured against the project's cost estimate.
Is there any litigation against Mirador Utsav Phase 1?
No litigation is declared on Mirador Utsav Phase 1's MahaRERA record as of September 2026. A clean record reflects what was filed, not a legal title check.
RERA projects nearby
- Shantaram Park Residency · Thane
- Aghav Resideny · Thane
- Fennel G · Thane
- Tulip N1 N2 N3 O1 · Thane
- Building No 5 Vardhaman Vatika Pahse II · Thane
- Chintamani Meadows · Thane
- La Luxuria · Thane
- Baradia Ekdant · Thane