Madar Signature
A residential / group housing project by Madar Builders & Developers in MIRA BHAYANDAR, Thane.
Data as of Oct 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗
Status & progress
Per MahaRERA record as of Oct 2026.
Project basics
As filed with MahaRERA — not analysis, just the record.
- Promoter
- Madar Builders & Developers · Partnership
- Project type
- Residential / Group Housing
- Land area
- 1,081 m² · Permissible built-up (FSI) 6,406 m²
- Total units
- 51 across 1 wing
- Estimated cost
- ₹24 Cr
- Land ownership
- Promoter is the landowner
- Held outside open sale
- 14 rehab
- Application date
- 13 Aug 2024
1 wing
Floors and unit counts as filed.
| Wing | Floors sanctioned | Total units |
|---|---|---|
| NA | 15 of 15 proposed | 51 |
Promoter & professionals
Names and registrations as declared — no background analysis.
- Architect
- AR SACHIN J INDVATKAR
- Structural engineer
- GR CONSULTANTS
- Project bank
- AXIS BANK
Where it sits
MIRA BHAYANDAR, Thane — 401107.
No active red flags
Absence of a flag reflects the record as filed, not an assessment of safety.
Madar Signature: common questions
Is Madar Signature RERA registered?
Yes. Madar Signature is registered with MahaRERA under registration number P51700077804, granted on 7 November 2024. As of October 2026, the registration is active.
What is the possession date of Madar Signature?
The developer has declared completion by December 2027 in its MahaRERA filing. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.
Who is the builder of Madar Signature?
Madar Signature is developed by Madar Builders & Developers, the promoter named in its MahaRERA registration.
Where is Madar Signature located?
Madar Signature is in Mira Bhayandar, Thane (PIN 401107), Maharashtra, as declared in its RERA registration.
How many units does Madar Signature have, and how many are sold?
Madar Signature has 51 units on its RERA registration. 14 were reported sold as of October 2026, leaving 37 unsold.
How much construction of Madar Signature is complete?
By the developer's own quarterly filing, 27% of the work is done, measured against the project's cost estimate.
Is there any litigation against Madar Signature?
No litigation is declared on Madar Signature's MahaRERA record as of October 2026. A clean record reflects what was filed, not a legal title check.
More RERA projects in Mira Bhayandar
- Sheetal Utsav · Thane
- Jyoti Breeze · Thane
- Shree Haven · Thane
- Mayfair Palmeira · Thane
- The Address Building No.5 · Thane
- Tiara Hills Phase I BLDG No 3, 5 and 2 · Thane
- Krishna Prestige · Thane
- Gaurav Aster · Thane