RERA projects in Badlapur, Thane
186 projects are registered with MahaRERA in Badlapur, Thane: 68 ongoing, 82 completed, and 36 lapsed, deregistered or in abeyance. 29 are running behind the completion date declared to RERA.
Most active builders here: Sai Properties (4), Tharwani Realtors (4), Mohan Lifespaces LLP (4), Unnamed Promoter 122711 (3), Raj Group (3).
- Infinity MeadowsPR1330002601926Infinity Realty · Active · completion Dec 2030
- Omkar Plaza D and E WingPM1331012600352Omkar Enterprises · Active · completion Jun 2027
- Saipark SahjeevanPM1330002600291Swamimauli Builder and Developer · Active · completion Dec 2029
- Vrindavan NidhiPM1330002600131Sai Properties · Active · completion Dec 2027
- Amber Solitaire Wing APC1330002502746Namaskar Builders and Developers · Active · completion Jan 2030
- Amber Solitaire Wing BPR1330002502419Namaskar Builders and Developers · Active · completion Jul 2029
- Shree Asthavinayak Complex Building No.1PM1330002502330Vastu Recon · Active · completion Jun 2028
- Trident VrindavanPR1330002502221Shri Krishna Shristi · Active · completion Dec 2028
- Vishnu KrupaPM1330002500811Patil Reality Group · Active · completion Dec 2027
- Ram EmpireP51700080024Patkar Realty LLP · Active · completion Jul 2028
- Shreeji Landmark NXP51700079080Shubh Infra · Active · completion Dec 2026
- P G GardenP51700078576P.G Enterprises · Active · completion Dec 2026
- Krishna Nayan Complex Phase IP51700056288Shreeji Builders and Developers · Active · completion Dec 2027
- Sanveg ResidencyP51700056072Om Vastu Homes NX · Active · completion Dec 2028
- Trident AvalonP51700055667Shri Krishna Realty · Active · completion Dec 2026
- Satyam AnantamP51700055439Shivansh Infra · In extension · completion Dec 2026 · delayed 365d
- Shreeji NXP51700054882Shubh Builders · Active · completion Dec 2026
- Sindhuraj Co . Opp. HSG. Soc. LtdP51700054041Arc Developers · Active · completion Dec 2026
- Laxmi ResidencyP51700054069Laxmi Infra · Active · completion Dec 2026
- ShivkalpP51700053583Shiv Enterprises · Active · completion Jun 2027
- Shubh Vastu Phase IIIP51700052762Shubh Homes · In extension · completion Dec 2026 · delayed 365d
- Prathmesh Vrindavan F WingP51700052743S. P. Group · Active · completion Dec 2026
- Shreeji Landmark Phase IIP51700052645Shubh Housing · Active · completion Dec 2026
- Vastu ImperiaP51700052579Vastu Builders and Developers · Active · completion Dec 2029
- Audumber CrownP51700051534Audumber Builders & Developers · Active · completion Dec 2026
- Dreams EnclaveP51700051292Dreamland Developers · Active · completion Dec 2026
- Shreeji MilestoneP51700050320Deep Laxmi Associates · Active · completion Jun 2029
- Dattatray ResidencyP51700049960Shri Krishna Vastu · In extension · completion Apr 2028 · delayed 121d
- Hari ShrushtiP51700049971Shrushti Creators · Active · completion Dec 2027
- Tulsi AanantaP51700048896Shree Developers · Active · completion Dec 2028
- Deep DharaP51700048280M/s. Deepali Infracon LLP · In extension · completion Dec 2026 · delayed 365d
- Shreeji GreensP51700046293Deep Laxmi Associates · Active · completion Jul 2026
- Samruddhi HeightsP51700045866Samruddhi Enterprises · Active · completion Dec 2027
- Dipti K Co. Op. Hsg. Soc. Ltd.P51700045995Inspire Reality · Active · completion Dec 2026
- Viraj IconicP51700045521Bonzer Orbit · Active · completion Dec 2026
- Vaishnavi HeightsP51700035016Vaishnavi Builders & Developers · In extension · completion Dec 2026 · delayed 920d
- Bhawani Shankar ResidencyP51700021856Bhawani Shankar Residency · Active · completion Dec 2026
- Akash Deep CHS LTDPR1330002601520MV Buildcon · Active · completion Mar 2030
- Laxmivihar Co-Operative Housing Society LimitedPM1330002502361Shree Saraswati Developers · Active · completion Dec 2029
- James Residency Phase 3P51700081009Unnamed Promoter 108964 · Active · completion Jun 2027
- Matrukrupa Co-operative Housing Society LtdP51700080588Shree Ganesh Krupa Builders and Developers · Active · completion Dec 2027
- Patels MeadowsP51700079829Trishul Enterprises · Active · completion Dec 2029
- Sai Girnar CHS LtdP51700079744Mitra Reality · Active · completion Dec 2028
- Om Rukmini Prasad Co Op HSG SocP51700079625Samruddhi Group · Active · completion May 2027
- Parivar Sadan CHS LtdP51700078920Kaivalya and Associates · Active · completion Mar 2027
- Harshana Co-Op Housing Society LtdP51700078506Shree Mangalam Builders and Developers · Active · completion Dec 2026
- Balkrushna Co-Op Housing Society LtdP51700066544Sai Homes · Active · completion Dec 2026
- Prabhu Darshan Co-Operative Housing Society LimitedP51700056412Nyp Developers · In extension · completion Apr 2027 · delayed 121d
- Om Guru Krupa Co-Op. Housing Society LtdP51700056339Sairaj Construction · Active · completion Mar 2027
- Sheetal Arcade B WingP51700055938Unnamed Promoter 92247 · Active · completion Jun 2027
- Crystal HeightsP51700055860Supreme Developers · Active · completion Apr 2027
- Laxmideep CHSLP51700055227Rudraa Developers · In extension · completion Dec 2026 · delayed 365d
- Riddhi Siddhi CHSP51700054957Vadnere Builder & Developers · Active · completion Dec 2026
- Aarya Prem Co-Op HSG SocP51700054798K S Builders & Developers · Active · completion Oct 2026
- Patels HorizonP51700053982Paramyogi Developers LLP · Active · completion Nov 2027
- Avani CHS LtdP51700053709Suraj Enterprises · Active · completion Dec 2026
- Trimurti Darshan Co Op HSG Soc LtdP51700053427G.k.builders · Lapsed · completion May 2025
- Shree Krishna Kunj Co-Op HSG Soc LtdP51700053328Infinity Infra · Active · completion Dec 2026
- Venkateshwara HeightsP51700053286Shree Venkateshwara Developers · Lapsed · completion Jun 2026 · delayed 181d
- Neelkanth Heights CHSP51700053059Shree Neelkanth Developers · In extension · completion Mar 2027 · delayed 365d
- Nav Balaji Co-Op HSG. Soc. Ltd.P51700053006Ruturaj Developers · Lapsed · completion Jun 2026 · delayed 181d
- Saishyam ArcadeP51700052932Shubh Buildspace · Lapsed · completion Dec 2025
- Neelkanth Deep CHSP51700052622M.S Enterprises · Completed · completion Mar 2026
- Om Shiv Angan CHSP51700052604Ritu Builders and Developers · Active · completion Mar 2027
- Mahalaxmi Ashish Co.Op. Housing Society Ltd.P51700052135VPM Developers · Lapsed · completion Mar 2025
- Vedant Nakshatra Wing K Phase VP51700051733Unnamed Promoter 122711 · Lapsed · completion Jun 2026
- Shivam HeritageP51700051455M.K. Enterprises · Lapsed · completion Oct 2025 · delayed 184d
- Saurabh HeightsP51700051500S K Developers · Completed · completion Mar 2026
- Dev Hill CrestP51700050866Dev Developers · Lapsed · completion Jan 2026
- Arunoday AnnexP51700049890Mangalya Shelter's · Completed · completion Mar 2025
- Shree Datta Narhari ApartmentP51700049472Omkar Enterprises · Lapsed · completion Dec 2025
- Paramount AptP51700049216Sharvi Enterprises · Lapsed · completion Dec 2024
- Moreshwar PrideP51700048841Rudraa Builders · Lapsed · completion Dec 2024
- Siddhivinayak Prasad CO-OP.Housing Soc.LtdP51700048754Shaurya Developers · Active · completion Dec 2026
- Manokamana SankulP51700048686Yuvika Associates · Completed · completion Dec 2025
- Vrindavan NisargP51700048292Sai Properties · Completed · completion Oct 2024
- Sai ArcadeP51700048104Om Sai Developers · Lapsed · completion Dec 2025
- Vrindavan JyotP51700048090Sai Properties · Completed · completion Oct 2023
- Krishna KutirP51700048000Shubh Krishna Realtors · Lapsed · completion Jun 2025
- Amber Darshan Co Op HSG SocietyP51700047806Varad Infra · Active · completion Sept 2026
- Tulsi AaradhanaP51700047616Raj Group · Lapsed · completion Dec 2025
- Tharwani Millennium ArcadeP51700047536Tharwani Realtors · Lapsed · completion Apr 2025 · delayed 364d
- New Pushpanjali CHSP51700047102Geetai Buildcon · Completed · completion Dec 2023
- Shreeji IconicP51700047083Shreeji Developers · Lapsed · completion Dec 2024
- Unique TowerP51700046791The Unique Builders · Lapsed · completion Jun 2024
- Tulsi AawasP51700046339Raj Group · Lapsed · completion Dec 2025 · delayed 365d
- Shree Chaitanya Co Op HSG LtdP51700045872G K Bulders · Lapsed · completion Dec 2024
- Sai PoojaP51700045755Sairaj Enterprises · Completed · completion Dec 2024
- Aditi HighlandP51700045643Unnamed Promoter 81625 · Active · completion Dec 2028
- Sadguru Harmony Phase 4 Wing DP51700034703Sadguru Associate · Lapsed · completion Jun 2026 · delayed 365d
- Neel Sagar CHSP51700034631Unnamed Promoter 111332 · Active · completion Dec 2027
- Sadguru Harmony Phase - 3 Wing CP51700034459Sadguru Associate · Lapsed · completion Jun 2026 · delayed 365d
- Sanmitra CHSP51700034394Swamimauli Infraworld · Completed · completion Dec 2025
- Rubayna Residency Phase 2P51700034205Unnamed Promoter 108964 · Completed · completion Dec 2025
- Unique HeightP51700033928Unnamed Promoter 106190 · Completed · completion Jan 2025 · delayed 338d
- Vitthai Anant PlazaP51700033932Unnamed Promoter 119376 · Active · completion Dec 2026
- Paradise PalmsP51700033685Samarth Enerprises · Completed · completion Dec 2024
- Pine ViewP51700033505Satya Developers · Active · completion Mar 2028
- Om Trupti Co Op Housing SocietyP51700033112Mahalaxmi Developers · Lapsed · completion Jun 2024
- Uma Kunj Cooperative Housing Society LimitedP51700033015Unnamed Promoter 111084 · Completed · completion May 2026 · delayed 167d
- Siddhivinayak ResidencyP51700033059Sairaj Developers · Completed · completion Dec 2024
- Thanekar PalacioP51700032795Thanekar Realtor LLP · Completed · completion Dec 2024
- Sujata Co-Op. HSG. Soc.P51700032708Samruddhi Enterprises · Lapsed · completion Jun 2024
- Shree Datta Chhaya Co Op Hou Soc LtdP51700032377Sairaj Construction · Lapsed · completion Dec 2024
- Bingo Dham Co-op Hsg Soc LtdP51700031207Sai Constructions · Lapsed · completion Dec 2022
- Bhavani Heights B WingP51700031110Kalyani Enterprises · Completed · completion Dec 2025
- Vedant Nakshatra Wing J Phase VIP51700031084Unnamed Promoter 122711 · Completed · completion Feb 2025 · delayed 52d
- Tulsi AagmanP51700030491Raj Group · Completed · completion Apr 2025
- Thanekar CivicP51700029932Shree Swami Samarth Enterprises · Completed · completion Apr 2024
- Shreeji Square Phase IP51700029512Shreeji Developers · Completed · completion Jun 2026
- Khatunbi ApartmentP51700028903Unnamed Promoter 96032 · Completed · completion Jun 2024
- The Nageshwar ApartmentP51700028432Omkar Developers · Lapsed · completion Sept 2023 · delayed 365d
- Shree Adrshan ApartmentP51700028301Shree Darshan Enterprises · Lapsed · completion Jun 2023
- The LandmarkP51700028309R Plus Infra · In extension · completion Feb 2028 · delayed 730d
- Swarajya-NXP51700027057Swamini Infra Private Limited · Completed · completion Apr 2024
- Redevelopment of Gurucharan CHSP51700026365Sairaj Developers · Completed · completion Mar 2023
- Shree Ganesh SymphonyP51700025109Pawar Group · Lapsed · completion Dec 2025
- New Suyog CHSP51700024581Sumit Enterprises · Completed · completion Mar 2022
- Ameyya Co Op HSG Soc LtdP51700024084Shree Balaji Developers · Completed · completion Dec 2021
- Tharwani Millennium City Phase IP51700023974Tharwani Realtors · Completed · completion Jul 2023
- Madhumalti ApartmentP51700023997Shree Neelkanth Associates · Completed · completion Dec 2021
- Tharwani Millennium City Phase IIIP51700023784Tharwani Realtors · Active · completion Dec 2026
- Tharwani Millennium City Phase IIP51700023782Tharwani Realtors · Lapsed · completion Jun 2025 · delayed 181d
- Vrindavan AnantamP51700023570M/s Sai Properties · Completed · completion Jun 2022
- Regency PlazaP51700023483Shree Sai Ventures · Completed · completion Dec 2026 · delayed 1006d
- Shri Venkatesh KrupaP51700023261Modi Developers · Completed · completion Dec 2023 · delayed 365d
- Sanveg Residency - Phase IIP51700022689Om Vastu Homes · Completed · completion Dec 2023
- Varun HeritageP51700021870Unnamed Promoter 80832 · Lapsed · completion Dec 2025
- Riddhi Siddhi ResidencyP51700021677Yash Enterprises · Completed · completion May 2023
- Shri Guruprasad ApartmentP51700021594Mangalya Developer · Lapsed · completion Jun 2022
- Trinity Galaxy R5P51700021561Trinity Developers · Lapsed · completion Mar 2022
- Manorama NagarP51700021259Arc Associates · Completed · completion Mar 2022
- Shree Sai Pooja ApartmentP51700020600Om Sai Realty · Completed · completion Sept 2019
- Trishul Golden VedaP51700020374A Plus Life Space · Completed · completion Apr 2023
- SamayeeP51700019920M S Buildcon · Completed · completion May 2022
- Royal EmpireP51700019929Sai Pooja Constructions · Completed · completion Dec 2024
- Precious HeritageP51700019589Neel Construction · Completed · completion Dec 2022
- Omkar ShivthirthaP51700019517Shree Sadguru Construction · Completed · completion Dec 2019
- Shubh VastuP51700019303Shubh Homes · Completed · completion Dec 2022
- Gaondevi ViharP51700019249Balaji Builders & Developers · Completed · completion Mar 2021
- Omkar ResidencyP51700019157Pinnacle Lifespaces · Completed · completion Jun 2022
- Ambar VaastuP51700019194Balaji Homes · Completed · completion Mar 2023
- Vedant ResidencyP51700019024Vedant Infrastructures · Completed · completion Dec 2021
- Lambodara PalaceP51700018977Vighnaharta Enterprises · Lapsed · completion Dec 2020
- Manohar Shreeji Nirvana Phase 5P51700018966Deeplaxmi Developers · Completed · completion Dec 2023
- Shreeji Nisarg Phase 2P51700018904Shreeji Developers · Completed · completion Dec 2023
- Rattan Galaxy Wing E. F and GP51700018806Rattan Properties and Projects Private Limited · Completed · completion Dec 2019
- Shree Krupa SagarP51700018612Om Sai Developers · Completed · completion Dec 2021
- Omkar Apartments Phase IIP51700018665Pinnacle Lifespaces · Completed · completion Oct 2021
- Vrindavan BhavanaP51700018376Sai Properties · Completed · completion Sept 2020
- Jeevan LifestylesP51700018087Jeevan Enterprises · Completed · completion Dec 2021
- Trident TowerP51700017751Shri Krishna Homes · Completed · completion Dec 2022
- Vighnaharta ArcadeP51700017711Vighnaharta Enterprises · Lapsed · completion Dec 2021
- Shree Ganesh ParadiseP51700017680Pawar Group · Completed · completion Feb 2021
- Panvelkar Estate - GreenfordP51700017332Panvelkar Infrastructures Private Limited · Lapsed · completion Dec 2024 · delayed 732d
- Hitesh Devesh ParadiseP51700017184Jai Ambe Construction · Completed · completion Dec 2021
- TathastuP51700017002Maharashtra Developers · Completed · completion Mar 2023
- Varun VillaP51700016837Maharashtra Developers · Completed · completion Sept 2018
- Shree RajP51700016625Rajententerprises · Completed · completion Apr 2019
- Dream MakersP51700016455Unnamed Promoter 119443 · Completed · completion Apr 2024
- Shrushti PrarambhP51700016101Shrushti Developers · Completed · completion Dec 2022
- Sanveg HillsP51700016047Sanveg Homes · Completed · completion Dec 2021
- Pathak ResidencyP51700016007Shree Mahalaxmi Constructions · Completed · completion Dec 2023
- Sai Krupa ResidencyP51700015567Sairaj Developers · Completed · completion Dec 2019
- Omkar ApartmentsP51700015525Pinnacle Lifespaces · Completed · completion Mar 2022
- Royal Wood ParkP51700015449Prabhavati Constructions · Completed · completion Jun 2021
- Metro ImperialP51700015305Metro Balaji Developers · Completed · completion Jun 2021
- Om Yashwant PlazaP51700015200Unnamed Promoter 125257 · Completed · completion Dec 2018
- Sai Kishan ApartmentP51700015142Sai Kishan Constructions · Lapsed · completion Jul 2019
- Deep EnclaveP51700014690Dattaguru Enterprises · Completed · completion Jun 2019
- Shivam GreensP51700014478M.k.developers · Completed · completion Dec 2023
- Swanand Treo Building No 3 -Swami GannayakP51700013459Swanand Heights · Completed · completion Dec 2017
- Shreeji GardenP51700012054Shubh Developers · Completed · completion Dec 2021
- Mohan Waters Edge IIP51700010737Mohan Lifespaces LLP · Completed · completion Dec 2021
- Om Savai NiketanP51700009373Sagar Super Structures Private Limited · Completed · completion May 2018
- vedantnakshatra L phase 3P51700008415Unnamed Promoter 122711 · In extension · completion Aug 2027 · delayed 1370d
- DBR ClassicP51700008402DBR Constructions Pvt Ltd · Completed · completion Dec 2021
- Rituworld Phase III M and NP51700006857Unnamed Promoter 104363 · Completed · completion Dec 2024
- Sadguru Harmony PH-1 Wing AP51700004904Sadguru Associate · Completed · completion Dec 2021 · delayed 730d
- Vishnu Vatika NX Wing C1 E1 E2 Phase 1P51700004777Vishnu Group · Completed · completion Oct 2023
- Mohan Willows IIP51700003971Mohan Lifespaces LLP · Completed · completion Dec 2019 · delayed 365d
- Motiram PrivilegeP51700003347Vanita Enterprises · Completed · completion May 2018
- Mohan Willows IP51700002731Mohan Lifespaces LLP · Completed · completion Jun 2019 · delayed 365d
- Arihant Anmol Phase IIP51700003112Arihant Vatika Realty Private Limited · Completed · completion Mar 2022 · delayed 546d
- Mohan Waters Edge IP51700002550Mohan Lifespaces LLP · Completed · completion Dec 2021
- Deep AanganP51700001986Parekh Infraprojects · Completed · completion Dec 2019