In ExtensionP51900013547Registered Oct 2017Delayed 2922dExtension2 red flags

Gulmohar Terrace

A residential / group housing project by Shining Sun Constructions in MUMBAI, Mumbai City.

Data as of Sept 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗

Overview

Status & progress

Per MahaRERA record as of Sept 2026.

Construction
95%
cost-weighted
Declared completion
Dec 2027
delayed 2922d
Units sold
0 / 102
0% sell-through
Basics

Project basics

As filed with MahaRERA — not analysis, just the record.

Promoter
Shining Sun Constructions · Partnership
Project type
Residential / Group Housing
Land area
948 m² · Permissible built-up (FSI) 1,947 m²
Total units
102 across 1 wing
Estimated cost
₹34.7 Cr
Parking
60 four-wheeler · 10 two-wheeler
Application date
29 Sept 2017
Buildings & units

1 wing

Floors and unit counts as filed.

WingFloors sanctionedTotal units
NA27 of 27 proposed102
People on record

Promoter & professionals

Names and registrations as declared — no background analysis.

Architect
P R DHARIA AND ASSOCIATES · CA/79/5376
Structural engineer
STRUCON CONSULTING ENGINEERS
Project bank
KOTAK MAHINDRA BANK LIMITED
Location

Where it sits

MUMBAI, Mumbai City — 400008.

Locality
MUMBAI
District
Mumbai City
Authority
Muncipal Corporation of Greater Mumbai
Red flags

2 flags on this project

What they are and why they matter — in the full report.

Unlock the 2 red flags on this project, plus the delay analysis and what-to-verify checklist.

Unlock full report — ₹99
Delay analysis & explanations

Why these flags matter

Unlock the delay analysis, sales & construction narrative, and what-to-verify checklist for this project.

Unlock full report — ₹99
Legal & encumbrance

Complaints, litigation & charges

Unlock the complaint list with order and warrant detail, plus full encumbrance and litigation detail and the FAQ.

Unlock full report — ₹99

Gulmohar Terrace: common questions

Is Gulmohar Terrace RERA registered?

Yes. Gulmohar Terrace is registered with MahaRERA under registration number P51900013547, granted on 9 October 2017. As of September 2026, the registration is active under a MahaRERA extension.

What is the possession date of Gulmohar Terrace?

The developer has declared completion by December 2027 in its MahaRERA filing, revised from the original December 2019. The record shows the project running 2922 days behind its declared schedule. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.

Who is the builder of Gulmohar Terrace?

Gulmohar Terrace is developed by Shining Sun Constructions, the promoter named in its MahaRERA registration.

Where is Gulmohar Terrace located?

Gulmohar Terrace is in Mumbai (PIN 400008), Maharashtra, as declared in its RERA registration.

How many units does Gulmohar Terrace have, and how many are sold?

Gulmohar Terrace has 102 units on its RERA registration. 44 were reported sold as of September 2026, leaving 58 unsold.

How much construction of Gulmohar Terrace is complete?

By the developer's own quarterly filing, 95% of the work is done, measured against the project's cost estimate.

Is there any litigation against Gulmohar Terrace?

No litigation is declared on Gulmohar Terrace's MahaRERA record as of September 2026. A clean record reflects what was filed, not a legal title check.