Emperia C2
A others project by Vee Square Tech Construct LLP in Pawne, Thane.
Data as of Oct 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗
Status & progress
Per MahaRERA record as of Oct 2026.
Project basics
As filed with MahaRERA — not analysis, just the record.
- Promoter
- Vee Square Tech Construct LLP · Others
- Project type
- Others
- Land area
- 10,545 m² · Permissible built-up (FSI) 34,800 m²
- Total units
- 137 across 1 wing
- Estimated cost
- ₹342.1 Cr
- Land ownership
- Promoter is the landowner
- Held outside open sale
- 42 landowner/investor share
- Application date
- 14 Mar 2023
1 wing
Floors and unit counts as filed.
| Wing | Floors sanctioned | Total units |
|---|---|---|
| NA | 12 of 12 proposed | 137 |
Promoter & professionals
Names and registrations as declared — no background analysis.
- Architect
- Stellar Design Studio · 1
- Structural engineer
- Project bank
- AXIS BANK
Where it sits
Pawne, Thane — 400710.
No active red flags
Absence of a flag reflects the record as filed, not an assessment of safety.
Emperia C2: common questions
Is Emperia C2 RERA registered?
Yes. Emperia C2 is registered with MahaRERA under registration number P51700050344, granted on 5 April 2023. As of October 2026, the registration is active.
What is the possession date of Emperia C2?
The developer has declared completion by December 2028 in its MahaRERA filing. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.
Who is the builder of Emperia C2?
Emperia C2 is developed by Vee Square Tech Construct LLP, the promoter named in its MahaRERA registration.
Where is Emperia C2 located?
Emperia C2 is in Pawne, Thane (PIN 400710), Maharashtra, as declared in its RERA registration.
How many units does Emperia C2 have, and how many are sold?
Emperia C2 has 137 units on its RERA registration. 6 were reported sold as of October 2026, leaving 131 unsold.
How much construction of Emperia C2 is complete?
By the developer's own quarterly filing, 18% of the work is done, measured against the project's cost estimate.
Is there any litigation against Emperia C2?
No litigation is declared on Emperia C2's MahaRERA record as of October 2026. A clean record reflects what was filed, not a legal title check.
More RERA projects in Pawne
- Kamdhenu Synergy Square · Thane
- Amara Business Park · Thane
- Sunrise Jewels · Thane
- Millennium 155 · Thane
- Rupa Emerald · Thane
- Q Living R8 · Thane