Durga Enclave
A others project by Anmol Developers in BHAYANER, Thane.
Data as of Oct 2026, from this project's public MahaRERA filing. View on the MahaRERA portal ↗
Status & progress
Per MahaRERA record as of Oct 2026.
Project basics
As filed with MahaRERA — not analysis, just the record.
- Promoter
- Anmol Developers · Partnership
- Project type
- Others
- Land area
- 1,920 m² · Permissible built-up (FSI) 2,329 m²
- Total units
- 106 across 1 wing
- Estimated cost
- ₹29.5 Cr
- Parking
- 1 four-wheeler · 0 two-wheeler
- Application date
- 29 Aug 2019
1 wing
Floors and unit counts as filed.
| Wing | Floors sanctioned | Total units |
|---|---|---|
| NA | 20 of 20 proposed | 106 |
Promoter & professionals
Names and registrations as declared — no background analysis.
- Architect
- APEX CONSULTANCY
- Structural engineer
- APEX CONSULTANCY
- Project bank
- KOTAK MAHINDRA BANK LIMITED
Where it sits
BHAYANER, Thane — 401105.
No active red flags
Absence of a flag reflects the record as filed, not an assessment of safety.
Durga Enclave: common questions
Is Durga Enclave RERA registered?
Yes. Durga Enclave is registered with MahaRERA under registration number P51700022467, granted on 25 September 2019. As of October 2026, the registration is active under a MahaRERA extension.
What is the possession date of Durga Enclave?
The developer has declared completion by April 2027 in its MahaRERA filing, revised from the original December 2024. The record shows the project running 851 days behind its declared schedule. The RERA completion date is the developer's legal commitment; the possession date in your agreement can differ, so check both.
Who is the builder of Durga Enclave?
Durga Enclave is developed by Anmol Developers, the promoter named in its MahaRERA registration.
Where is Durga Enclave located?
Durga Enclave is in Bhayaner, Thane (PIN 401105), Maharashtra, as declared in its RERA registration.
How many units does Durga Enclave have, and how many are sold?
Durga Enclave has 106 units on its RERA registration. 80 were reported sold as of October 2026, leaving 26 unsold.
How much construction of Durga Enclave is complete?
By the developer's own quarterly filing, 98% of the work is done, measured against the project's cost estimate.
Is there any litigation against Durga Enclave?
No litigation is declared on Durga Enclave's MahaRERA record as of October 2026. A clean record reflects what was filed, not a legal title check.
RERA projects nearby
- Ramabai Paradise · Thane
- Sagar Apt · Thane
- Gayatri Elegance · Thane
- Indra Neel · Thane
- Shree Anand · Thane
- Damodar Tower · Thane
- Esquire · Thane
- Opulence · Thane